网络十大博彩公司

Home | Simplified Chinese | Japanese | Korean
English About Changzhou Mayor's Mailbox Latest News Laws and Regulations
Changzhou Metro to have 6 lines with total length of 208 km
Font:〖L M S

It was learned on May 22 that after Changzhou made the rail transit network plan in 2005, the revision of the plan was initiated in 2012, which includes a long-term plan to 2030.

In 2030, the rail transit network of Changzhou will cover both the central urban area and the suburb areas. The central rail transit contains six lines with total length of 208 km, including 182 km underground and about 26 km of elevated light rail transit.

The six rail transit lines in planning are:

Number Start from Destination Length

Line 1 Xingang Center West Taihu Lake 42km

Line 2 Hengshanqiao Benniu 36km

Line 3 Changzhou North Station Miaoqiao 29km

Line 4 Xinlong Center Jianhu 36km

Line 5 Qinglong Science & Education Town 28km

Line 6 Xuejia Science & Education Town 37km

扫一扫在手机打开当前页

Sponsored by: General Office and Foreign Affairs Office of Changzhou Municipal People's Government All rights reserved
苏公网安备32041102000483号 网站标识码:3204000002 苏ICP备05003616号 Technical Support Phone:0519-85685023
Best viewed in IE 6.0 browser with and above 1024*768 resolution.
十大博彩正规平台 - 十大正规博彩平台
全球最大的博彩公司-全球最大的博彩平台
bet36体育比分直播